NexGold Infill Drilling Continues to Intersect High Grade Gold Mineralization at the Goldboro Gold Project; 3.58 g/t Gold Over 18.3 Metres, 2.79 g/t gold over 19.7 Metres and 103.50 g/t Gold Over 0.7 Metres
SINA HONG KONG LIMITED - 26 Jun 2025NexGold Infill Drilling Continues to Intersect High Grade Gold Mineralization at the Goldboro Gold Project; 3.58 g/t Gold Over 18.3 Metres, 2.79 g/t gold over 19.7 Metres and 103.50 g/t Gold Over 0.7 Metres ...